Welcome

We are a retired American couple living in France, enjoying the good life with our cats. Our house is in a small hamlet among the Ste. Foy vines. We also have a sailboat that the male half of the spousal unit sailed across the Atlantic in the summer of 08. When the weather warms we will start to visit the sailing ports of Europe. Our stories chronicle our life in France: the good life, the hard life, and the sailing life.

Wednesday, July 1, 2009

Ma Route a Velo







A pattern has developed in which there is a ladies group cycle somewhere near Bergerac one day a week and then a cycle to town for a morning coffee with one of the cyclers who lives close enough that Ste. Foy is a good mid-way meeting place. Because it is so hot these days, we are meeting at the cafe earlier in the morning so we can get home by noon. The countryside is beautiful between the house and town and here are a few of the views along my route.

Tuesday, June 30, 2009

End of Book Chaos


Thursday everything (text and images) for the book will be submitted to the publisher. AltaMira Press has scheduled production to begin on July 10, so no more putzing about. I am furiously working on scanning slides, inputting illustration numbers in the text, and writing captions. There is still lots to do but we WILL make this deadline. It has not been easy to have lost my office space because of the house renovation, but such is life. The renovation work is scheduled to be completed by next Tuesday. So within one week all pressing work will be over. Cleaning up and moving stuff back can be taken at a leisurely pace.

Monday, June 29, 2009

Summer is Here


The market was brimming with all of the veg and flowers that signal summer. Tomatoes finally taste like a summer tomato, the beans are thin and delicious. Our garden has produced so many beets we can't eat them fast enough. The onions and shallots are ready to harvest. It is very hot and there has been no rain for weeks, so the seeds we planted to take us through to the fall have not yet germinated despite the fact that we water regularly. We are very lucky to have a well. RXC fitted it out with a pump so we just have to turn it on and get water that is off the meter and therefore we can use as much as we want. However, even the water level in the well is lowering. With this dry heat, the grapes are very happy and thriving. If summer continues like this, the wine should be excellent this year.

Sunday, June 28, 2009

The Quilt Group Wraps Up for the Summer
















Our quilting group suspends meetings for the summer. Thursday was the finale in which we all made a picnic tote bag for the plates, silverware, and glasses that one takes to the various food events that define life in the French countryside. We had been given the pattern so we could select and cut out our fabrics in advance. There were cutting tables, irons, and sewing machines set up to work. People brought the quilts they made during the year some of which you can see here. We of course had our own food event eaten outside. We had poulet basquaise from a local traiteur and members brought appetizers and desserts. There was wine bien sur. I am about halfway done with my picnic sac which I need to finish before the weekly evening dinners start up in Ste. Foy and I need to make a second one for RXC.

Wednesday, June 24, 2009

le Paysage


I have been trying to get out on my bicycle, away from the noise and dust of the renovation work and away from the book. On that front I am inputting images and writing captions. We are close. Mostly I cycle up to town and back which is about 20k. But there have been some trips such as at the weekend when we cycled with a friend and tried to get to St. Emillion. A restaurant waylaid us about 2k outside of our destination. The countryside in this area is beautiful as the small roads we use for cycling roll in and out of the vineyards and suddenly you can come upon a windmill, pigeonnier, chateau, or some other lovely stone building.

Tuesday, June 23, 2009

On to Phase Two




Sunday we finally moved back into our bedroom. The bedrooms and hallway are finished and the new bathroom will be finished as soon as RXC can finish up the tile work. Right now the plumber is installing the sinks and shower panel so he can't get in there. Sunday we put together the Metro racks for the walk in closet, finished the floor tiles off with an acrylic sealer and slowly moved our furniture back. I think I had the best night's sleep that night, that futon/mattress arrangement in the living room was getting old.


The next job was to shift all of the stuff we stored upstairs in order to empty out the bedroom side of the house to someplace else. With some of the bedroom furniture moved, there was room in the dining room for fragile things like the Christmas ornaments. However, at least 20 Rubbermaid tubs of stuff sits out on the terrace. We had to leave my loom upstairs, at least it is still in its shipping box. But at least we had the staircase to make the move this time.

Tuesday, June 16, 2009

Enfin l'escalier







Much to our surprise the staircase arrived this morning. They brought it in pieces and then assembled and installed it little by little. By lunchtime, Dante was able to perform his inspection. So on June 16, 2009 more than 10 years after we bought the house, the loft is accessible by something other than a ladder. This is a milestone!