We are back in construction mode. Tiling the terraces and walkway was the last part of the work on the house that we contracted for. This work began on Monday. As with all of the other work we had done, the workers arrived early in the morning, worked hard, cleaned up at the end of each day, and returned the next morning.
Between 6 and 9 people worked each day.They have been arriving at 7:45 am when it is just getting light enough to see to lay tile. At this point much of the tile is down and it should be finished with one more day of work. Unfortunately, we must have gotten a bad batch of tiles because there was more breakage than normal, so they are out of tiles and cannot finish facing the steps until a new batch arrives.
Their work is excellent and the light color and clean lines and surface of the tiles really makes a difference.
1 comment:
Oh! That's going to look fantastic. Didn't realize you were going to do that as well!